Security Television Network
Fired up for launch in 2026 π π
About this video
With more than 2 million pounds of thrust, Artemis II will have four RS-25 engines located at the bottom of the core stage that will power the rocket on its 500-second climb to space.
Attribution: L3Harris Technologies
The interactive STN application appears here when JavaScript is available. Published facts and source links above remain readable without JavaScript.