Loading STN…

Security Television Network

Peak Power: USACE Supplies When Demand Is High

About this video

Just hours before the Jan. 23 Winter Storm hit Tulsa and surrounding areas, U.S. Army Corps of Engineers, Tulsa District Senior Controller, Nick Hicks was on duty, waiting for the call to activate hydropower units if power was needed from the Fort Gibson Powerhouse in Fort Gibson, Okla.

U.S. Army Corps of Engineers, Tulsa District powerhouse personnel are responsible for maintaining and activating hydropower units when the grid needs peak power.

Fort Gibson is one of eight Tulsa District powerhouses that can provide peak power to the electric grid in 15 minutes or less. Their efforts help ensure municipalities and end users have electricity when demand is highest.

U.S. Army Corps of Engineers, Tulsa District

Attribution: Source: DVIDS Hub — U.S. Department of Defense public-affairs media

The interactive STN application appears here when JavaScript is available. Published facts and source links above remain readable without JavaScript.

Skip to content