Security Television Network
Award notice: Naval Submarine Base Kings Bay, Maintenance Dredging, Entrance Channel, Camden County, Georgia and Nassau County, Florida
SAM.gov award notice: Naval Submarine Base Kings Bay, Maintenance Dredging, Entrance Channel, Camden County, Georgia and Nassau County, Florida. Read the original notice, agency, solicitation and source dates. STN does not infer a winning company or award amount.
Record details
- Name
- Naval Submarine Base Kings Bay, Maintenance Dredging, Entrance Channel, Camden County, Georgia and Nassau County, Florida
- Published
- 2026-09-10
- Record modified
- 2026-09-16T17:25:14.315Z
- Record type
- Award notice
- SAM.gov notice ID
- c23c57b1c95d4f6881d519c1a21b5a5c
- Source notice type
- Award Notice
- Solicitation number
- W912EP26CA032
- Agency
- DEPT OF DEFENSE
- Office
- W074 ENDIST JACKSNVLLE
- Posted
- 2026-09-10 17:17:55 (source timezone unspecified)
- Response deadline (source text)
- Unavailable
- Place of performance
- Unavailable
- NAICS
- 237990
- PSC
- Z1KF
- Set-aside
- Unavailable
- Catalog category
- defense
- Winning company / recipient
- Not asserted
- Award amount
- Unavailable — not asserted by this notice projection
- Source record updated
- 2026-09-16T17:25:14.315Z
- Latest completed catalog synchronization
- 2026-10-31T17:26:44.483Z
- Source SHA-256
- cbd2df85a03ed78360395750aa2c8c315c634e6ed3441a67d30ee68df67ea645
PROJECT DESCRIPTION: Base project work involves maintenance dredging of the Kings Bay Entrance Channel Cut-1N through Range-E. The excavated material will be distributed among the Fernandina Ocean Dredged Material Disposal Site (ODMDS)(D/A-O), the Fernandina Nearshore Placement Area (P/A-N), the Fort Clinch Placement Area (P/A-F), and the North Beach Placement Area (P/A-NB). Incidental work includes environmental and water quality monitoring, vibration monitoring, beach fill quality control, beach tilling, and sea turtle and sturgeon trawling, and interim demobilization and mobilization (cutter-suction dredges only). Option A project work consists of Fort Clinch pre-placement debris removal. Option B work includes beach tilling from FDEP Monument R-019 to R-029.
What this source notice establishes
The label describes explicit language in the synchronized official notice. A protest-related notice does not establish a GAO ruling, protest disposition or procurement violation. Follow-on or recompete language is not independent confirmation of an approved future procurement.
No winning company, loss by a particular company, transaction obligation or total contract value is inferred from the title or narrative. Silence, expiration, cancellation and another company’s award are not treated as a company loss.
This is a dated reference, not a claim that a notice was posted today. Removal from the active opportunity feed does not itself withdraw a historical notice. STN rechecks the latest completed stored source snapshot for this notice, including corrections and withholding decisions, before serving this page. Unavailable evidence is not replaced by a demonstration record.
| SAM.gov notice ID | Source classification | Posted | Agency | Solicitation |
|---|---|---|---|---|
| c23c57b1c95d4f6881d519c1a21b5a5c | Award notice | 2026-09-10 17:17:55 (source timezone unspecified) | DEPT OF DEFENSE | W912EP26CA032 |
Related information and sources
Attribution: Original public notice: SAM.gov. Source-notice classification is distinct from a verified company award or legal outcome.
The interactive STN application appears here when JavaScript is available. Published facts and source links above remain readable without JavaScript.