Award notice: Accelerated Design-Build to Budget Construct Barracks, Multi-Use Training Facility, Galley & Firehouse at USCG TRACEN Cape May, Cape May, NJ
SAM.gov award notice: Accelerated Design-Build to Budget Construct Barracks, Multi-Use Training Facility, Galley & Firehouse at USCG TRACEN Cape May, Cape May, NJ. Read the original notice, agency, solicitation and source dates. STN does not infer a winning company or award amount.
Record details
- Name
- Accelerated Design-Build to Budget Construct Barracks, Multi-Use Training Facility, Galley & Firehouse at USCG TRACEN Cape May, Cape May, NJ
- Published
- 2026-09-17
- Record modified
- 2026-10-03T17:02:15.457Z
- Record type
- Award notice
- SAM.gov notice ID
- bdcf17c9431b4c1ebceb8532e11bd2e3
- Source notice type
- Award Notice
- Solicitation number
- 70Z04726RPCNI0006
- Agency
- HOMELAND SECURITY, DEPARTMENT OF
- Office
- FDCC(00047)
- Posted
- 2026-09-17 13:52:13 (source timezone unspecified)
- Response deadline (source text)
- Unavailable
- Place of performance
- Cape May, NJ, USA
- NAICS
- 236220
- PSC
- Y1FC
- Set-aside
- No Set aside used
- Catalog category
- border
- Winning company / recipient
- Not asserted
- Award amount
- Unavailable — not asserted by this notice projection
- Source record updated
- 2026-10-03T17:02:15.457Z
- Latest completed catalog synchronization
- 2026-10-31T17:26:44.483Z
- Source SHA-256
- dce35b446ee09f1f9473fc07d80a84ecd1caf4115ef28901b62ece6be60bc4c9
The project will be to Design/Build new facilities at TRACEN Cape May, NJ. The scope of work includes but is not limited to construction of barracks buildings to accommodate an annual capacity of 5,600 recruits. It is a critical and non-negotiable requirement that the annual operational capacity of TRACEN Cape May be maintained without interruption for the entire duration of the construction project. Therefore, all construction efforts must be planned and executed in a manner that ensures no reduction in the annual number of recruits processed. The continuity of operations is a paramount objective of this project. While the RFP drawings indicate the construction of four barracks buildings, the Designer of Record is granted the flexibility to modify this number. The ultimate number of buildings is secondary to achieving the essential operational throughput. This approach allows for potential design optimizations and innovative solutions, provided the core mission-critical requirement of recruit accommodation capacity is fully satisfied. The scope of work includes but is not limited to; demolition and disposal of abandoned steam trenches, buildings and building old foundations, relocation of electrical duct banks and salvaging of transformers, temporary office trailer setup, construction of new VIP review stand, grandstands with cantilevered shading and new parade path. During construction of the new barracks a minimum of 3 barracks buildings must remain operational at all times. This project can be delivered in phases. However, the construction phases outlined here will occur only after the Base Item 0001 process is awarded and finalized. Proposed phasing is as follows: During phase 1, the existing MCPOCG (Bldg. 911) can be demolished and two temporary office trailers will be provided complete with water, sewer, electrical and C5IT connections. Two new barracks buildings can be constructed. Then James and Healy Halls can be demolished. Phase 2 will require construction of all remaining barracks facilities. In addition to the remaining barracks facilities, construction of several facilities is required in order of precedence: 1.Multi-purpose training facility (~80,000GSF) 2.Galley or expansion of existing galley to meet future throughput requirements. (~35,000GSF) 3.Fire station (~20,000GSF) The firehouse must have a natural gas generator and automatic transfer switch meeting the requirements of NFPA 70, Article 701, Legally Required Standby Systems. The generator shall be sized to power all the loads within the entire building. The UPS shall power all loads associated with emergency services. Emergency services loads include, but are not limited to: radio communication system, emergency response system, fire alarm front end, burglar alarm front end, all communication equipment, etc. Note: See Attachment H Prior to demolition of existing galley and fire station, the new facilities will need to be constructed. All facilities are required to be sustainable in accordance with the Council on Environmental Quality (CEQ) Guiding Principles for Federal Buildings, Dec 2020. All facilities shall strive to incorporate the best in energy efficiency, environmental performance, and advanced controls using a “whole building” integrated design approach, as well as comply with ENERGY STAR standards. The final phasing of these additional facilities will have to be determined by the Designer of Record (DOR) in coordination with the TRACEN Cape May Facility Engineering office. See site civil drawings.
What this source notice establishes
The label describes explicit language in the synchronized official notice. A protest-related notice does not establish a GAO ruling, protest disposition or procurement violation. Follow-on or recompete language is not independent confirmation of an approved future procurement.
No winning company, loss by a particular company, transaction obligation or total contract value is inferred from the title or narrative. Silence, expiration, cancellation and another company’s award are not treated as a company loss.
This is a dated reference, not a claim that a notice was posted today. Removal from the active opportunity feed does not itself withdraw a historical notice. STN rechecks the latest completed stored source snapshot for this notice, including corrections and withholding decisions, before serving this page. Unavailable evidence is not replaced by a demonstration record.
| SAM.gov notice ID | Source classification | Posted | Agency | Solicitation |
|---|---|---|---|---|
| bdcf17c9431b4c1ebceb8532e11bd2e3 | Award notice | 2026-09-17 13:52:13 (source timezone unspecified) | HOMELAND SECURITY, DEPARTMENT OF | 70Z04726RPCNI0006 |
Related information and sources
Attribution: Original public notice: SAM.gov. Source-notice classification is distinct from a verified company award or legal outcome.
The interactive STN application appears here when JavaScript is available. Published facts and source links above remain readable without JavaScript.